Insights · Boundary areas

Rented machinery and equipment on site

A rented crane, a hired lift, a scaffolding system held under a rental arrangement: a good part of modern construction's equipment isn't owned by the company using it. Damage, though, doesn't check the title deed – and the rental agreement typically puts the burden on the hirer. So rented equipment raises a double question: what does the rental agreement say, and what does the insurance say about it?

In brief:
  • The rental agreement typically puts the burden of damage to rented equipment on the hirer – even regardless of fault.
  • The question is which cover takes on that burden – the hire company's insurance, a CAR endorsement, or machinery insurance?
  • The content of a hire company's "damage waiver" needs reading carefully – it has its own deductible and exclusions.
  • Before hiring, cross-checking the rental terms against the cover is the routine.

What does the rental agreement say?

Hire companies' agreements typically place full liability for damage on the hirer: theft, breakage, damage – often regardless of fault, with or without a damage-waiver option built into the hire fee. The content of that optional waiver is the key question: how big is its deductible, what does it exclude (e.g. operator error, unattended overnight storage), and what does it ask for in return (secure storage, key control)? This is the same reading routine as for insurance wordings: the wording reader.

Which cover applies?

There are three options, and it's decided project by project. The hire company's cover (the damage waiver) – convenient, but limited in content. The CAR endorsement: rented machinery and equipment can also be brought into the project policy – in which case the value and the scope need to be stated precisely: the machinery article. Your own machinery insurance: some arrangements can also be extended to rented and hired equipment. The wrong answer here, too, is "one of them will probably cover it": at claim time, the three agreements point at each other, while the hire company keeps billing regardless.

Scaffolding and formwork systems

Rented scaffolding and formwork deserve a special mention: high value, long hire periods, and exposure to storms – the loss patterns in the temporary-works article mostly play out on rented systems. Aligning the rental agreement's claims-settlement rules (replacement cost vs depreciated value, down-time charges) with the cover is squarely a money question here.

The routine

Three steps before hiring: read the damage chapter of the rental agreement; decide which cover should take on the burden (and check that it actually does); and organise day-to-day protection – locking up, key discipline, a documented handover with the hire company. The machinery strategy as a whole: the construction-machinery article; at claim time, the usual routine applies: claim notification – plus an immediate alert to the hire company.

A question tailored to your own project? Book a free 20-minute project consultation →

This article is for general information only and does not constitute an offer, or insurance or legal advice. The specific covers are determined by the insurers' terms and conditions in force at any given time; the section structure and the range of extensions vary by insurer.

Related articles

Request a quote – the first step takes 20 minutes.

As an independent broker, insurers compete for you – not the other way round. I don't charge a fee for advice – the insurer pays the intermediary's remuneration; it is part of the insurance premium.

Book a slot