Project CAR or annual open cover? Two routes

Construction insurance runs in two modes: a policy for a single project, or an annual open cover for all of the company's work. Both follow the same cover logic – but the actual content of the cover can differ: an open cover typically works with standard terms and a per-project value limit, while a project policy can be tailored to the specific job. The choice isn't a matter of taste, but of work organisation.

In brief:
  • Project policy: one job, one-off inception – the natural route for large, one-off projects.
  • Annual open cover: typically a turnover-based contract that covers jobs starting during the year according to the notification rules.
  • The open cover's strength is continuity – its risk is a missed notification.
  • A large project outside the scope of the open cover can still call for its own separate policy alongside it.

When does a project policy fit?

When the company runs one or two larger, clearly defined jobs a year, or when a single outlying project (in value, technical content or duration) breaks the usual pattern. We tailor the project policy to that specific job: exact value, exact period, extensions matched to the site. This is also the typical route for tenders, since the tender documentation often expects a project-specific certificate – details: certificate in the tender.

When does the annual open cover fit?

When jobs run continuously – roof renovations, façades, utility connections, back-to-back contracting jobs – arranging a policy job by job is slow, administrative, and easy to leave gaps in. The annual open cover turns this around: the contract fixes the terms in advance, typically on a turnover or job-count basis, and jobs that start are brought into cover according to the notification rules. So the open cover doesn't "cover everything automatically": following the rules – what to notify, when and how – is the heart of the arrangement.

The open cover's typical pitfalls

There are three recurring mistakes. The first is a missed notification: the job starts, the notification slips, and that's exactly when the loss happens. The second is outgrowing the cover: the company grows, the turnover basis goes out of date, and the cover falls behind reality – which is why an review (if warranted or on request) is needed. The third is a change of profile: the open cover is written for the usual types of work, and an unusual project (different technology, greater depth, an operating facility) can fall outside it – in which case it needs discussing, or its own separate policy.

Help with deciding

The right question isn't "which is cheaper", but which follows the company's way of working more closely. A handful of large projects a year → project policy. Continuous, similar jobs → open cover. A mixed picture → open cover for the regular workload, a separate policy for the outlying project. It's worth seeing the numbers and terms from several insurers' competing quotes – the process page and the free consultation can help with that.

A question tailored to your own project? Book a free 20-minute project consultation →

This article is for general information only and does not constitute an offer, or insurance or legal advice. The specific covers are determined by the insurers' terms and conditions in force at any given time; the section structure and the range of extensions vary by insurer.