Insights · Process & decisions

Cover timing: from inception to handover

Project cover isn't a date, it's a life cycle: inception before work starts, life during construction, a switch at handover, an afterlife in the maintenance period. Each stage has its own tasks – and most cover mishaps are born not from a bad policy, but from bad timing. Here's the calendar.

In brief:
  • Before work starts: inception, certificate, taking the requirements down to site level.
  • During construction: change notifications, extending cover if the schedule slips, claims routine.
  • At handover: reporting the handover, activating the maintenance cover, starting property insurance.
  • In the maintenance period: handling call-backs with cover in mind.

Before work starts: laying the foundation

Cover should be in place for taking over the site – the inception article covers the process and how to handle urgent cases. This is also where submitting certificates belongs (certificate article), along with a step that's often missed: sharing the policy's requirements (security, protective measures, logging) with the site management. Cover is decided on site, not in a folder.

During construction: upkeep

Three routines keep the cover alive. Change notification: a rise in value, a change in content, a new site – following the notification article. Extension: if the completion date slips, extend the policy before it expires, not after – working alongside an expired policy is the quietest risk there is, because nothing flags it. And claims-readiness: knowing the notification route and the documentation routine – claim article, checklist.

At handover: the switch

Handover is a triple insurance event: closing off the project cover (reporting that handover has taken place – by section, for a phased handover), switching on the maintenance cover, and starting property insurance on the finished works from the day of handover. The three steps fit on one checklist: handover checklist. The gap here is the most expensive kind: a building left for "we'll insure it next week" is uncovered until then.

The maintenance period: the afterlife

While call-backs are happening, the maintenance cover is live – but only for what it actually covers: this is where the difference between the two levels becomes practical. Maintenance work is still work: it should be documented, with attention paid to the existing (now operating) surroundings. At the end of the stage, the circle closes – and the lessons feed into the next project's needs assessment. For an open cover, the same cycle also runs on an annual rhythm: review article.

A question tailored to your own project? Book a free 20-minute project consultation →

This article is for general information only and does not constitute an offer, or insurance or legal advice. The specific covers are determined by the insurers' terms and conditions in force at any given time; the section structure and the range of extensions vary by insurer.