Insights · Process & decisions

Seven common inception mistakes to avoid

Picking apart claims turns up the same thing again and again: the problem didn't start at claim time, it started at inception. The seven mistakes below are responsible for most disputed cases – and every one of them can be prevented with a careful inception round. Treat this article as a pre-inception due-diligence list.

In brief:
  • The classic seven: late inception, existing property left out, under-valuation, missing maintenance cover, a disorganised chain, unworkable requirements, a forgotten extension.
  • Their common root: the policy wasn't tailored to the project's reality.
  • The defence isn't rocket science: a needs assessment that asks everything, plus a maintenance routine.

1–2: Mistakes of timing

Late inception: work starts, the policy is "in progress" – the first week's losses go uncovered, because there's no retroactive cover: inception article. Forgotten extension: the project slips, the policy expires, nobody says a word – the quietest mistake there is, because nothing flags it while things carry on: change notification.

3–4: Mistakes of value

Existing property left out: on a refurbishment or extension, the biggest risk – the existing building – is left without cover: existing property article. Under-valued project: the "let's round down, it'll be cheaper" logic brings a proportional settlement at claim time: sum insured article. Both come down to the inception round's five basic questions: what, how much, where, when, with whom.

5–6: Mistakes of structure

Disorganised chain: the subcontractors are neither clearly in nor clearly out – nobody knows who the policy covers, and a loss sets off a chain reaction of recourse: chain article. Missing maintenance cover: it only comes to light after handover that call-backs are running with no cover – and by then it can no longer be added: maintenance cover article.

7: The unworkable requirement

The policy requires a night watchman, the project works with cameras; it asks for enclosed storage, the site has an open laydown area. The cover is strong on paper and empty on site – and that comes to light at claim time: reasons for rejection. The defence: at inception, the wording's requirements have to be checked against how the project actually operates – and either the way of working has to be adjusted, or the wording renegotiated. That's exactly the work of structuring cover: needs-assessment article, and for a reality check there's the two-minute self-check.

A question tailored to your own project? Book a free 20-minute project consultation →

This article is for general information only and does not constitute an offer, or insurance or legal advice. The specific covers are determined by the insurers' terms and conditions in force at any given time; the section structure and the range of extensions vary by insurer.

Related articles

Request a quote – the first step takes 20 minutes.

As an independent broker, insurers compete for you – not the other way round. I don't charge a fee for advice – the insurer pays the intermediary's remuneration; it is part of the insurance premium.

Book a slot